I have two multipoint servers, one 2011 and one 2012. I'm trying to migrate my clients over to the 2012 one so I can replace the 2011 one with 2012. I was able to get a zero client up and running fine on the 2012 server, using a domain name for a login. I then tried to unassign two of my zero clients from the 2011 server and assign them to the 2012 one. The first seemed to be OK, but when I hit the assign button for the second one, I had a blue screen:
Now both zero clients cause this kind of reboot if they are assigned to the 2012 server.
Is there a way to clear out the MPS database - to make it forget about any clients that have ever connected?
My guess is that those clients were not quite disconnected from the 2011 server (suspended??) when I assigned it to the 2012 one.
Thanks for any help. I do have the memory dumps...
Peggy Thrasher